Bonavista Energy Gas Plant
Compression & Process
Ansell (65 MMSCFD)
Ansell, AB
Startec worked directly with Bonavista Energy on process design and defining scope of the plant — no engineering company was involved. The Ansell project was successfully delivered on time with approximately 0.8% change from the original contract price.
Basic Description of Equipment Provided
- One (1) 100MMSCFD Low Temp (-30°C LTS) Liquids Recovery Plant c/w a 72 ID” x 180” Low Temperature Separator
- Two (2) 800hp Engine Drive Screw Refrigeration Compressor Packages
- One (1) x 100% 125 HP Baldor Electric Drive, Ariel JGQ/2 -1 Sweet Gas OH Compressor Package
- Shipped loose and mounted off-skid:
- Two (2) Gas-Gas heat exchanger bundle
- One (1) Gas-Liquid heat exchanger
- One (1) 72” ID X 360” S/S Low Temperature Separator
- One (1) 48” ID X 360” S/S Propane Accumulator
- One (1) C3+ Product Air Cooler
- One (1) Propane Condenser/CLOW Air Cooler