Progress Energy, Three Hydrocarbon Liquids Recovery Plants
Compression & Process
Caribou (100 MMSCFD)
Caribou South (100 MMSCFD)
Altares (100 MMSCFD)
Northeast British Columbia
All three Progress Energy plants were completed on schedule and averaged under 3% change from the original contract price.
Basic Description of Equipment Provided
- One (1) Process Skid includes Gas Chiller, De-Ethanizer Reboiler, De-Ethanizer Tower, Glycol Regeneration with pumps & filter.
- One (1) Refrigeration Skid includes two (2) x 50% refrigerant compressors 500hp each c/w Suction Scrubber, Economizer and Propane filter dryer.
- Shipped loose components:
- Three (3) Gas-Gas exchanger bundle
- Two (2) Gas-Liquid exchanger bundle
- One (1) combined Refrigerant Condenser/CLOW Cooler
- C3 + Product Cooler
- One (1) 48” OD X 360” S/S Refrigerant Receiver
- One (1) 72” ID X 360” S/S Low Temperature Separator